| Countries | Cities | Airport Names | IATA | |||||
Airport Search: ![]() |
||||||||
Kuching Airport
Airport Directory » Malaysia » Kuching » Kuching AirportKuching International Airport (KIA) (IATA: KCH, ICAO: WBGG) is Sarawak's briny international airport and is located 11 kilometre (6NM) southward of the town of Kuching. The airport is also an airbase for the Royal Malaysian Air Force and the new restituted depot complex is capable of care 5 million riders per annum and it is the 3rd biggest airport in Malaysia after Kuala Lumpur International Airport and Kota Kinabalu International Airport. KIA has turned quickly with an increasing figure of riders and aircraft motility. In the yr of 2006, KIA dealt 3,196,352 riders with a check volume of 40,292 voyages. In the same yr, 29,716 metrical metric ton of freight were dealt. Kuching International Airport is the secondary hub for Malaysia Airlines and AirAsia and has been turning quickly to undertake the claim of the traveler in the East Malaysia district.
History
The airport was made by the British Government of Sarawak in the 1940’s on the outskirts of Kuching city. It was opened for used on 26 September 1950. The airport dwell of a little “L” characteristic individual story Terminal, Cargo, Fire Station. Air Traffic Control Tower, Meteorological Service and Maintenance construction clumped in 1 area , a little apron of four parkland embayments and 1372 metre long with 46 m breadth of a individual landing track. Navigational (Direction Finding Equipment) and Radio Aids were set up at the airport.
Kuching International Airport then went the gateway to Sarawak, Brunei and North Borneo (Sabah as it is named currently) with the unveiling of one time weekly Dakota services arise from Singapore. By the finish of 1954, scheduled air services into Kuching International Airport turned by springs and springs. This was show in the 1954 statistics which entered 1550 aircraft motilities, 13,564 riders, 95,911 kg load and 25,984 gets off.
In 1959 the landing track was continued to 1555 m length to make style for Viscount aircraft functioning.
Followed by another enlargement in 1962 to survive 1921 m in length to adapt Comet four functioning. The depot was also enlarged in the same yr. A Control Zone was constituted at Kuching in November as apart of the architectural plan to supply an Air Traffic Control Service commensurate with the development of air traffic. Malayan Airways Limited functioned the Singapore / British Borneo Territories Regional Services with Viscount and DC3 aircraft, daily schedules related Kuching and Sibu with Singapore on the other side, and Brunei and Borneo on the other.
In 1971 the Malaysian Government (as Sarawak get together the Federation of Malaysia on 16 November 1963) pursued a squad of Canadian Consultants to do Master Plan survey of Kuching International Airport.
In Decembers 1972, the authority accepted the Consultant’s describe. Among the recommendations were:
- The extension and beef up of being landing track to take larger jet plane. E.g. Boeing 707.
- The building of a new depot construction on the northward location of the landing track.
Work on the extension and beef up of the landing track was set about in 1973 and was finished in 1976 ready to take Boeing 707 with the new landing track measure out of 2454 m length.
In 1980, consistent with the coming of Airbus 300 functioning it was imperative the landing track paving strength be upgraded to run across Airbus 300 demand. Work on this set about and was finished in early 1982.
Construction of the depot complex at the northward location took a center level at the finish of 1978 and was finished in July 1983. This modern depot replaced the previous depot, was opened on 24 August 1983. The depot complex covering a built-up area of 81 hectares with a floor infinite of 13,000 centare, consisted the three-storey rider depot flanked by a neatly be after constructions of Air Traffic Control Tower and Operation Block, Cargo Building, Fire Station, Maintenance Building, VIP Building and ancillary services construction.
As in 1999, two air hose corporations from 2 neighbour states functioned schedule services into Kuching International Airport besides 3 of Malaysia's own air hose and as many as eight private civil aviation corporations. Irregular charted voyages were also functioned by 2 foreign air hose into the airport.
The millenary takes another rapid development in air power world. As a effect, the new depot with a new human face was restituted and continued replacing the old characteristic. The new depot complex was opened on Monday 16 January 2006 by Pehin Sri Haji Abdul Taib Mahmud (Chief Minister of Sarawak) and Dato’ Sri Chan Kong Choy (Minister of Transport Malaysia). The full work on the depot finished in April 2006. Consisting of nine embayments (three embayment for B747 & A380 wide-body), and four distant embayments (for turbo-propeller plane aircraft). Plus three new embayments at the General Aviation Apron.
Expansion, Renovation & Redevelopment
Kuching International Airport is undergoing an upgrade that is due for pass completion on one March 2008. The overhaul works to increase depot construction floor infinite to 46,000sq.m. were finished 15 calendar month in front of schedule and the full restituted depot construction was officially opened by the then Prime Minister of Malaysia Datuk Seri Abdullah Ahmad Badawi on Monday, 17th of April 2006. The labor was cared by Global Upline Sdn. Bhd. and it cost some 620 million MYR. With this, the airport is currently capable of care Boeing B747 & Airbus A380 aircraft with no limitation.
Malaysia Airlines Boeing 747 at the landing trackThe works due for pass completion on one March 2008 regards AGL, earthworks and paving extension of the being landing track length from 2454m to 3780m and shoulders from 46m to 60m, extension of being parallel taxi strip to a full parallel taxi strip with interconnectedness/ rapid outlet taxi strip including continuing of taxi strip stopping and shoulders to 30m. The air side apron works includes the building of a load apron, high-intensity lights and markings. Existing optical and non-visual helps shall be upgraded and/or relocated consistent with the upgrading programme to assist the continued landing track. With aggregative of nine entrances, the airport is able to deal six narrow organic structure aircraft, three broad organic structure aircraft and four turbo-propeller plane aircraft at distant stand up at anybody 1 clip. Besides, there is also a car parking (Gate nine) especially made for the world biggest air hose A380.
Present & Future
The Chief Minister of Sarawak, Pehin Sri Haji Abdul Taib Mahmud, wishes to draw more foreign air hose to KIA so as to evolve the Sarawak Tourism Industry. Singapore's budget air hose, Tiger Airways, has been given the green visible light to assist KIA.
Malaysia Airlines in KIA has attained cypher accident value in 2006.
AirAsia may present daily voyages from Kuching to Bangkok, Jakarta, Macau (Hong Kong, Zhuhai, Guangzhou) & Clark (Manila). The other international paths that AirAsia desire to acquire before long shall be Kuching - Brunei and Kuching - Singapore. Should the chance for Kuching-Perth voyages rise AirAsia would have no jobs functioning them with A320 aircraft.
The Sarawak Government is working closely with Malaysia Airlines (MAS) and AirAsia to cut long-haul voyages. Sarawak desire use Brunei and Singapore as entry points to raise the 2 ruling gateways - Kuala Lumpur International Airport (KLIA) Kota Kinabalu International Airport (KKIA). This includes reconstructing (with higher oftenness) all direct international & domestic voyages antecedently suspended by Malaysia Airlines.
Sarawak will do a formal proposal to Malaysia Airlines (MAS) for direct voyages from Hong Kong, Taipei, Kaohsiung & Korea to Kuching.
Original article.

