| Countries | Cities | Airport Names | IATA | |||||
Airport Search: ![]() |
||||||||
Rajiv Gandhi Airport
Airport Directory » India » Hyderabad » Rajiv Gandhi AirportHyderabad International Airport (IATA: HYD, ICAO: VOHS) (Telugu: హైదరాబాదు అంతర్జాతీయ విమానాశ్రయము ), (Urdu: راجيف غاندي مطار دولي ) also known as Rajiv Gandhi International Airport, is a new airport near Shamshabad, approximately 22 kilometre (14 mi) from the town of Hyderabad, in India. It is named after former Prime Minister of India, Rajiv Gandhi. The airport replaced the former international airport of the town,Begumpet Airport. Commercial voyage functioning commenced at twelve:01 am on 23 March 2008. Rajiv Gandhi International Airport is the 2nd public-private partnership embark in the Indian airports, the 1st being the Cochin International Airport. It also has 1 of the longest landing track in the world. It is a hub for Jet Lite, SpiceJet and IndiGo Airlines. It also assists as a focal point town for Air India, Jet Airways and Kingfisher Airlines.
Partnership
The airport labor is a public private joint embark between GMR Group, Malaysia Airports, the Government of Andhra Pradesh and the Airports Authority of India.
Project programme
Hyderabad Airport Check InModern FacilitiesThe airport is being build in various stages, and one time finished it shall be able to supply much-needed base to deal big aircraft and international traffic. The airport is anticipated to be the biggest in full term of area size of it and will house world-class installations. In the initial levels of pass completion, the airport shall be able to adapt 10 million riders. In the final levels, it shall be able to supply to 40 million riders a yr. The aggregative cost of the labor is Rs 2,370 crore (US$560 million). The airport is being built on an area of 5,400 acres (22 kilometretwo).
Initial stage
A 105,300 mtwo (1,133,000 sq foot) depot, having the capability to deal 12 million riders per annum has been build. The depot construction has twelve contact and 30 distant stands for aircraft parkland. Other constructions, including the air traffic control tower, Technical Building, load (100,000 t capacity), Maintenance, public utility company having a united area of 35,000 mtwo (380,000 sq foot) have been build. A Car Park for 1500 auto in front end of the depot construction has been germinated for the convenience of riders and visitants to the airport. A hotel has also been build in this stage.
Construction of a low cost depot will set about in the 2nd one-half of 2008 and will supply to 0.5 million riders on the railway lines of Singapore and Kuala Lumpur airports.
Second stage
In Phase 2, Terminal one shall be expanded to an area of 250,000 mtwo (2,700,000 sq foot) to supply to the turning claim. Post enlargement, the depot construction will have 54 stands for aircraft parkland. The low cost depot will also be expanded to its full capacity of 1.5 m riders per annum. A 2nd landing track shall be necessitated before the starting time of building for Terminal 2. An increase in the figure of constituted installations such as hotels, business office, load and care installations shall be attempted. The aggregative build up area at the goal of this stage shall be about 470,000 mtwo (5,100,000 sq foot).
Final stage
The airport will hit its full adulthood in this stage. An additional floor area of 430,000 mtwo (4,600,000 sq foot) shall be build conveying the aggregative build up area to 900,000 mtwo (9,700,000 sq foot).
The ultimate master programme is to supply to 40 million riders per annum to both airside and landside installations within the airport location. Further acquisition of district to the northward and southward will permit enlargement of a 3rd and 4th landing track.
- Aircraft embayments: 42
- Aerobridges : twelve
- Air traffic command (tallness): 75 m (Template:Convert/)
- Terminal area : 105,000 mtwo (Template:Convert/sqmt) (including undercroft)
- Peak 60 minute rider capacity: 3200
- Baggage Handling System : 4-level In-line luggage projection screening system X-ray
- Check-in CUTE counters: 130
- Check-in SELF Checkin counters: 16
- Immigration Counters:46
- Levels (flooring): two(going and reaches)
- Runways: 1, taxi strip (additional taxi strip)
- Runway lift: 2,026 foot (618 m)
- Runway length: 4,265 m (13,990 foot)
- Runway breadth: Template:Convert/
- Runway shoulder: Template:Convert/
- Runway orientation: 09/27
- Apron area :
- Airport land visible radiation: CAT I (both finishes)
- Navigation equipment: VOR, NDB, VOR/DME, ILS (CAT I on both finishes)
- Aircraft Accommodation: From little aircraft to Code F aircraft (such as Airbus A380)
- Cargo capacity: > 100,000 t
Connections to airport
The major advised access points to the new airport include:
- Four-lane National Highway seven with service lanes (on its due west)
- Four-lane Srisailam Highway (on its east)
- Eight-lane 24.38 kilometre (15.15 mi) access commanded Outer Ring Road (ORR)
- Widening of 52 kilometre (32 mi) Inner Ring Road with many overpasses with 8 lanes.
- Four-lane 11.6 kilometre (7.2 mi) long P. V. Narasimha Rao Elevated Expressway.
- Multiple traffic direction go-ahead to decongest town routes
- Alternate four-lane route P-7 from Mailardevpally to Mamidipally via Jalapally to decongest Srisailam Highway
- Extension of Multi-Modal Transportation System (MMTS) up to Umdanagar(Shamshabad).
Other jump fashions being work up with State authority include:
- Metro rail continuing from Falaknuma to Shamshabad
- Dedicated airport railroad train from Secunderabad to airport 40 kilometre (25 mi) continue to be covered in around 25 min.
Shuttle service
Passengers is able to avail themselves of the services of 'Aero Express', the airport shuttle, which is a unique installation supplied by the Rajiv Gandhi International Airport. These jitneys run 24x7 at 30 min. time interval to/from the coming after points in the town and the airport between 03:30 60 minutes and 23:30 60 minutes, and at a one 60 minute oftenness between 23.30 60 minutes to 03.30 60 minutes.
- Paryatak Bhawan, opposite to Hotel ITC Kakatiya, Green Lands. This place is merely before the junction from where the road guides to Ameerpet from Begumpet.
- Keyes Girls Highschool, near Clock Tower, Secunderabad. The place is near Saint John Church & also close to Railway Officer’s Rest House.
- Quli Qutub Shah Stadium opposite to City College. This place is merely adjacent to Airtel business office in Quli Qutub Shahi bowl, merely 500 m (1,600 foot) from Madina junction.
- SD Hospital, Mehdipatnam. This place is in between Defence entrance and SD Hospital entrance where PVNR state highway incline sets about. This place is on right mitt side of the route.
- HITECH City, opposite to Silparamam and diagonally opposite to the HITECH City Phase one Towers.
Car renting services
Car renting services are supplied by Avis, Hertz and Budget.
Radio cab
- Easy Cabs
- Meru Cabs
- Dot Cabs
Hospitality
The Hyderabad Urban Development Authority (HUDA) programmes to set about a hotel corridor named Regal Broadway to supply to the estimated 5 million riders who shall be transposing through the international airport set about in the yr 2008.
The labor of Regal Broadway is at a real nascent level right currently and nothing is nail down as yet. According to their initial programmes, it was to be a 150-acre (0.61 kilometretwo) game in Shamshabad but currently they have to relocate the entire labor as commercial composites are not allowed in that area .
The Novotel Hyderabad Airport was opened in October 2008 Featuring 305 appartment and rooms with WiFi, business organisation traveler is able to also savour the installations of the Premier executive floor, alongside with the convenience of 2 eating house, 2 bars, a pool and running across appartment for up to 400 invitees. The Novotel Hyderabad Airport also offers a health club and a 24 60 minute fittingness center.
Original article.

