| Countries | Cities | Airport Names | IATA | |||||
Airport Search: ![]() |
||||||||
Hindustan Airport
Airport Directory » India » Bangalore » Hindustan AirportBengaluru International Airport (Kannada: ಬೆಂಗಳೂರು ಅಂತಾರಾಷ್ಟ್ರೀಯ ವಿಮಾನ ನಿಲ್ದಾಣ) (IATA: BLR, ICAO: VOBL) is a international airport assisting the town of Bengaluru (Bangalore), Karnataka, India. The airport is turn up 4 kilometre (2.5 mi) southward of Devanahalli and is 40 kilometre (25 mi) from the central downtown of Bengaluru (30 kilometre (19 mi) from the Bangalore City Railway Station) and covers 4,000 acres (1,600 ha). It replaced the old HAL Bangalore International Airport. Construction of the airport set about in July 2005, after a decennium long time lag. It was anticipated to be kick off on 30 March 2008 but due to hold up in air traffic command (ATC) services, it set about its functioning on the nighttime of 23 May 2008, merely before midnight.
Bangalore is the fourth-busiest airport in India, after Mumbai, Delhi and Chennai.
Future programs for the airport location imagine enlargement of the depot and landing track and generous commercial development, including business organisation hearts, tax-free stores, entertainment centers, shopping mall and business office infinite.
Construction
BLR Airport under buildingThe new airport was originally be after to adapt 3.5 million riders a yr, but this was redesigned to deal 12 million riders per yr. The redesign ensued in an increase in the size of it of the depot, figure of aircraft stand up, new taxi strip layouts and back up base.
A programme is also being functioning for a direct rail service from Bangalore Cantonment Railway Station to the Basement Rail depot at the airport. Access on the National Highway seven is being continued to a 6 lane freeway, with a 3 foot (0.91 m) bound wall, as building go in front.
A new state highway was be after to link the airport to the town's Ring Road. The state highway, anticipated to be a tolled route, would commence at Hennur on the Outer Ring Road. However the state authority, bring up a survey account of the National Highways Authority of India (NHAI), has stated the Karnataka High Court that the proposed superintendent state highway linking the Outer Ring Road and Bengaluru International Airport is not feasible. After many hold up and confusions with the press, the airport was eventually kick off on May 23 , 2008 when a Jet Airways voyage from Mumbai district here . Also , min. afterwards an Indian Airlines voyage to Singapore go forth Bengaluru International Airport , surviving the 1st of all time take-off from the airport.
In 2008, Benguluru International Airport was the 4th Most Delayed Airport in the World consorting to FlightStats sampling of the airport's voyages, with only 60.16% on clip reaches.
Airport specs
Terminal
The rider depot is a individual, to the full air-conditioned, four-level construction capable of adapting international and domestic functioning. The cellar houses the retail storage, rest area and services. The reaching and going area are divided vertically with a modern, simple, straight-ahead flowing system. The domestic and international departure lounges, and the bulk of the retail sales outlet are turn up on stage two (1st floor). The check-in installations and luggage repossess are turn up on stage one (ground level). The depot is projected for relief of functioning and minimal upkeep.
The aggregative floor area is about 71,000 mtwo (760,000 sq foot) and the depot construction is projected to adapt 3,000 riders at extremum 60 minute. The project reflects the most good industry pattern and provides for 24-hour-operations, under all weather condition. The airport wll run across a the criterion place by the Airports Authority of India (AAI), the International Civil Aviation Organization (ICAO) and the International Air Transport Association (IATA)..
The airport is able to deal 11 million mortals per annum with 27 aircraft motility per 60 minute and an judged 550 motion in May 2008. At its extremum, it is able to deal 720 aircraft motions in a solar day.
Common Use Terminal Equipment (CUTE) enabled check-in counters: 54 and 20 self check in counters.
The airport has 20 entrances, nine aero-bridges, including 1 duplicate arm and 19 distant jitney embayments. There are a aggregative of 42 aircraft stand up, all of which have a fueling cavity. This is the 1st clip in Indian airports that the parkland stand up have the fueling cavities. The subway cavities assists the aircraft to fuel from the stand up itself.
In the 1st stage of development, a auto parkland for 2,000 auto in front end of the depot construction at the ground stage has been germinated for the convenience of riders and visitants to the airport.
Runway
The airport has 1 landing track that is able to adapt all typewrites of aircraft. There are architectural plans to construct a 2nd landing track when the one-year traffic of the airport makes 18 million riders per yr which is now gauged to attain around 2013-2014.
Retail and duty free shop
The international going subdivision is 1 of the biggest duty free shop mercantile establishments in India, a duty free shop area for arrivals is also supplied. The domestic going area also has retail sales outlet.
Domestic Lounges
Domestic departure lounges are supplied by:
- Air India
- Jet Airways
- Kingfisher Airlines
International Lounges
The airport has 3 international departure lounges:
- Kingfisher Lounge
- Oberoi Lounge
- The Leela
Hospitality
A 321 appartment Business Class hotel is under building as division of the airport complex, opposite the independent depot construction. This hotel, owned and to be functioned jointly by Larsen & Toubro and East India Hotels Limited under the Trident trade name, is scheduled for opening in June 2010.
Columbia Asia Hospitals functions a clinic at the airport and also provides medical aid in example of an pinch.
Transport to the airport
As the new airport is 40 kilometre (25 mi) outside the town, a new high-speed rail link up is being be after to link up the town to the airport.
Bangalore Metropolitan Transport Corporation runs 12 bus route from as many places in the town to link to the new airport. Air Conditioned Taxi services to the BIA is also available.
Renaming
On the 27th of February, 2009, the Karnataka Government sent on the proposal of renaming the airport after the town's establisher Kempe Gowda to the central authority. The Karnataka arm of the Congress also directed a missive to the central authority claiming that the airport be renamed to Kempe Gowda International Airport.
Original article.

